The façades and balconies of The Swell, Stella-Plage

Buying new-build, simply explained.

An off-plan purchase (VEFA) means buying a home before it is built. Here is how it works, when you pay and what protects you.

Off-plan in 30 seconds.

Three ideas are enough to understand the rest of this page.

01 You buy off-plan.

You choose a home from the plans, with its technical specification. It is built for you.

02 You pay in step with the construction.

Not all at once: each payment corresponds to a stage actually reached, within limits set by law.

03 You are protected at every stage.

A cooling-off period, a completion guarantee, then one-year, two-year and ten-year guarantees after completion.

The steps of an off-plan purchase.

Click on a step: who is involved, what you sign, what you pay.

Step 01 of 09

Searching for your property

The deed of sale for The Swell is drawn up by Maître Héloïse Brajou, notaire in Neufchâtel-Hardelot: 467 avenue François 1st, 62252 Neufchâtel-Hardelot, 03 21 99 23 00.

You pay in step with the construction.

The Swell payment schedule, exactly as it appears in the reservation contract: ten instalments, from the deposit to handover. Enter a price, then move the works along.

€

Editable example. No data is stored.

Foundations completedThe building rises out of the ground.
Signing · deposit2 %
Start of works23 %
Foundations completed10 %
Ground-floor slab10 %
Second-floor slab10 %
Third floor completed5 %
Weathertight shell15 %
Plastering completed15 %
Completion of the building5 %
Handover · balance5 %

Payment schedule from The Swell reservation contract, article 1.7  . Each line shows the share due at that stage; the counter shows the total paid so far. The deposit is deducted from the first instalment. The schedule stays below the ceilings set by the French construction code (art. R261-14): 35% at foundations, 70% weathertight, 95% at completion. The amounts for your own home are in your contract.

Calculate my monthly repayments
The Swell façade on the garden side, Stella-Plage

From the planning permission to the handover, a single point of contact.

About us

Why buy new-build.

Six advantages, from day one to the service charges.

Reduced notaire's fees

Reduced duties compared with older property: less money tied up at purchase.

Turnkey

No renovation work to plan for: you move into a finished home.

Live in it or invest

Main home, second home or buy-to-let: new-build adapts to the plan.

Low-energy building

A home that meets the most recent technical and environmental standards.

Property tax exemption

New-build homes may be exempt from property tax for the first few years, depending on the commune .

Shared communal spaces

Lift, parking, bike store: shared facilities, shared charges.

Protected before, during and ten years after.

Each guarantee covers a period and a type of problem. The timeline runs from completion (year 0) to the tenth year.

Completion guaranteeBefore completion: the works will be finished, even if the developer fails.
Construction
All defects reported at completion or within the year.Two-year
1 year
Removable fittings: shutters, taps, doors…Removable fittings: shutters, taps, doors and so on
2 years
Ten-year structuralThe structural soundness of the building and anything that makes it uninhabitable.
10 years
Structural damageThe repair is funded up front, without waiting to establish who is liable.
2nd → 10th year

Statutory guarantees applying to any off-plan purchase. The exact conditions are set out in the reservation contract.

Guarantees relating to the construction

  • Structural damage insurance
  • One-year defects guarantee
  • Two-year guarantee
  • Ten-year structural guarantee

Technical inspection body for the works

  • Checking the structural soundness of the works
  • Safety on site
  • Checking of acoustic and thermal insulation standards
  • Checking of all fittings and equipment

Guarantees relating to the building

  • Soil survey
  • Checking of floor areas
  • Project management
  • Firm and final price
Résidence Le Rubanier in Calais, garden side

Fifty-two homes completed in Calais, seventeen of them adapted.

See Le Rubanier

The questions we are asked.

General answers, based on the Code de la construction et de l'habitation .

Can I change my mind after reserving?
Yes. After receiving the reservation contract, you have a 10-day cooling-off period, with no need to give a reason. The reservation deposit is then returned to you.
What if the works were not finished?
The completion guarantee ensures that the home will be finished: a financial institution funds the end of the works if the developer can no longer do so.
When do I have to pay?
In step with the construction, with caps set by law: 35% on completion of the foundations, 70% at the watertight stage, 95% on completion, the balance at handover. See the calculator.
What should I do if I find a defect at completion?
Note it on the completion report: these are the "snags". They are covered by the one-year defects guarantee, as are any defects reported during the following year.
The Swell seen from the garden at golden hour, Stella-Plage

A question about your purchase?

The best way to understand a development is to go and see where it is being built.

Sales officeTo be replaced by an address on the domain
62780 Cucq, Stella-Plage
Phone07 56 81 77 66