You choose a home from the plans, with its technical specification. It is built for you.
Buying new-build, simply explained.
An off-plan purchase (VEFA) means buying a home before it is built. Here is how it works, when you pay and what protects you.
Off-plan in 30 seconds.
Three ideas are enough to understand the rest of this page.
Not all at once: each payment corresponds to a stage actually reached, within limits set by law.
A cooling-off period, a completion guarantee, then one-year, two-year and ten-year guarantees after completion.
The steps of an off-plan purchase.
Click on a step: who is involved, what you sign, what you pay.
Step 01 of 09
Searching for your property
The deed of sale for The Swell is drawn up by Maître Héloïse Brajou, notaire in Neufchâtel-Hardelot: 467 avenue François 1st, 62252 Neufchâtel-Hardelot, 03 21 99 23 00.
You pay in step with the construction.
The Swell payment schedule, exactly as it appears in the reservation contract: ten instalments, from the deposit to handover. Enter a price, then move the works along.
Editable example. No data is stored.
Paid in total at this stage
70 000 €35% of the price
Payment schedule from The Swell reservation contract, article 1.7 . Each line shows the share due at that stage; the counter shows the total paid so far. The deposit is deducted from the first instalment. The schedule stays below the ceilings set by the French construction code (art. R261-14): 35% at foundations, 70% weathertight, 95% at completion. The amounts for your own home are in your contract.
Calculate my monthly repayments
From the planning permission to the handover, a single point of contact.
About usWhy buy new-build.
Six advantages, from day one to the service charges.
Reduced duties compared with older property: less money tied up at purchase.
No renovation work to plan for: you move into a finished home.
Main home, second home or buy-to-let: new-build adapts to the plan.
A home that meets the most recent technical and environmental standards.
New-build homes may be exempt from property tax for the first few years, depending on the commune .
Lift, parking, bike store: shared facilities, shared charges.
Protected before, during and ten years after.
Each guarantee covers a period and a type of problem. The timeline runs from completion (year 0) to the tenth year.
Statutory guarantees applying to any off-plan purchase. The exact conditions are set out in the reservation contract.
Guarantees relating to the construction
- Structural damage insurance
- One-year defects guarantee
- Two-year guarantee
- Ten-year structural guarantee
Technical inspection body for the works
- Checking the structural soundness of the works
- Safety on site
- Checking of acoustic and thermal insulation standards
- Checking of all fittings and equipment
Guarantees relating to the building
- Soil survey
- Checking of floor areas
- Project management
- Firm and final price
Fifty-two homes completed in Calais, seventeen of them adapted.
See Le RubanierThe questions we are asked.
General answers, based on the Code de la construction et de l'habitation .
Can I change my mind after reserving?
What if the works were not finished?
When do I have to pay?